After returning from my summer holiday, I found time to glue the remaining pair of 18x18 mm longerons to the fuselage. Not much else to report.
I spent a couple of hours fitting the longerons to the fuselage, cutting the notches and dry-fitting the parts. The gluing itself went smoothly. Since the longerons had been held roughly in position on the fuselage for a couple of weeks, little force was needed to hold them in place during gluing.
Now I need to clean up and sand the fuselage, then inspect all the joints carefully.
×
View along the fuselage after gluing the remaining 18x18 mm longerons.
×
Overall view of the fuselage framework on the assembly jig after removing the clamps.
×
View from the firewall, with the longerons fitted along both sides of the fuselage.
×
Side view of the fuselage framework and the glued-in longerons.
×
View of the longerons and bulkheads from the opposite side.
×
Side view showing the longerons passing through the bulkhead notches.
×
Close-up of the longeron-to-bulkhead joints before cleaning up.
×
Another view of the glued joints and the curvature of the longerons.